The reinforced concrete poured under the tank single time. Flatness ± 1cm, plain space without roughness. Tank attached to the concrete slab with anchors and anchor bolts.
KAPEO SP. Z O.O.
UL. STRAŻACKA 3,
83-321 MŚCISZEWICE, PL
+48 58 685 41 81
BIURO@KAPEO.COM.PL